Description
Rare 40.55-acre tract in Jennings, Hamilton County, FL just off Exit 467 (SR 143), the first Florida exit southbound on I-75 from Georgia. Fronts CR 143 with paved access, only 3/4 mile from I-75 and 4 miles south of the GA line. Preliminary data suggests traffic at Exit 467 averages 40,000 vehicles/day (FDOT confirmation pending). A new 40,000 sq. ft. Poker/Card Room is under construction nearby (est. completion 2026). Area growth includes an Industrial Park at Exit 461, the planned 350-acre Stone Bridge mixed-use project at Exit 451 (2027), and Suwannee Iron Works relocating 100+ jobs. Zoned AG-4 (1 house/5 acres) with strong potential for rezoning, with additional adjacent land potentially available.
-
0BEDS
-
25 to 50 AcresACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
Rare 40.55-acre tract in Jennings, Hamilton County, FL just off Exit 467 (SR 143), the first Florida exit southbound on I-75 from Georgia. Fronts CR 143 with paved access, only 3/4 mile from I-75 and 4 miles south of the GA line. Preliminary data suggests traffic at Exit 467 averages 40,000 vehicles/day (FDOT confirmation pending). A new 40,000 sq. ft. Poker/Card Room is under construction nearby (est. completion 2026). Area growth includes an Industrial Park at Exit 461, the planned 350-acre Stone Bridge mixed-use project at Exit 451 (2027), and Suwannee Iron Works relocating 100+ jobs. Zoned AG-4 (1 house/5 acres) with strong potential for rezoning, with additional adjacent land potentially available.
All listings featuring the BMLS logo are provided by BeachesMLS Inc. Copyright ©2025 BeachesMLS, Inc. IDX information is provided exclusively for consumers' personal, non-commercial use and it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. This information is not verified for authenticity or accuracy and is not guaranteed. Data last updated 2025-11-17T07:32:42.41.